best free html templates

Aquatics Centre Refurbishment

Refurbishment of high-profile Aquatics Centre which hosted the 2002 Commonwealth Games, provided training facilities for the 2012 Olympics Team GB, and remains the current venue for the Paralympic World Cup. It has capacity for 1,000 spectators, and contains a main Olympic rated pool, a diving pool, and a training pool

Client

Kier Construction Northern

Location

Manchester, UK

Completion Date/Stage

RIBA Stage 2

Project Value

£25m                  

The Challenge

23 Consult have worked with Kier on other high-profile complex projects, and we have successfully provided lifecycle services on such schemes. This delivery and operational complexities of this project allow for delivery in two key phases whilst the building remains in operation throughout the refurbishment period. The lifecycle cost plan therefore:

• Recognises phased construction and ensure that replacement cycles and hard facilities management operations are coordinated

• Derives maximum value from the refurbishment works

• Allows for the unique operational costs associated with a bespoke facility 

Achievements 

Production of Whole Life Cost plan and report as part of the RIBA Stage 2 design assessment, including modelling of current design and identification of where future cost savings can be made, whilst setting out profiles to coordinate with the timings of phased delivery of refurbishment works.

Mobirise

Services Provided

Whole Life Costing/Lifecycle Costing

Project Steps

1

Working with the Client and other consultants to establish the best datasets for developing a Whole Life Model

2

Production of bespoke lifecycle model for the scheme using design and capital cost information

3

Working with building users and operators to understand the current operational costs for the building

4

Production of initial Whole Life report for the scheme, including identification of major future-cost elements, and issue for review and comment

5

Working with the Client and other consultants to establish the best datasets for developing a Whole Life Model

Partners/Contracts on the project

The Aquatics Centre is jointly owned by Manchester City Council, University of Manchester and Manchester Metropolitan University. It is operated on their behalf by MCRactive.


This will be changed to fit the project testimonial
“We worked with 23 Consult on a maintenance and repair contract of M&E Equipment… their level of managing the contract was the best we have encountered with a fine eye for detail where it mattered. I personally learnt a lot from the way they worked and use some of those systems they implemented within our company now” 

Operations Director

Want to know more about our services?

Get in touch today

Address

Unit 110
Queens Dock Business Centre
67-83 Norfolk Street
Liverpool L1 0BG

Contacts

Email: info@23consult.com
Phone: 0333 772 2305

Accreditations

Registered in England & Wales.
Registration No: 08790086
VAT No: GB 180 4223 35

Regulated by RICS
Constructionline "Gold"